Network & connectivity

A leased line at head office and broadband at the branch is not a network

Leased lines, MPLS, SD-WAN and Wi-Fi designed as one thing, across every site you run.

Circuits

Internet leased lines and broadband

Primary and backup circuits with genuinely diverse last miles where the site allows it, and a single window of escalation regardless of which carrier is at fault. We hold authorisations with eight carriers, so the recommendation follows the site rather than a quota.

  • Carrier feasibility run per site before anything is ordered
  • Internet leased lines with committed SLAs
  • Broadband and FTTH where the economics favour it
  • Diverse-path redundancy on sites that justify it
  • Single-window escalation across every carrier we place
WAN

MPLS and SD-WAN

Private WAN where the application demands it, SD-WAN where the economics favour it, and an honest answer about which. Most estates end up with both, and the design should say where the boundary is.

  • MPLS provisioning and lifecycle management
  • SD-WAN design, rollout and policy management
  • Application-aware routing and path selection
  • Branch standardisation on one build and config template
  • Central policy with per-site exceptions documented
Wireless

Wi-Fi enablement and site survey

Predictive and on-site surveys before the design, so coverage is engineered rather than discovered through complaints after go-live.

  • Predictive and passive site surveys
  • Controller and access point deployment
  • Guest and corporate SSID separation
  • Captive portal and authentication integration
  • Post-deployment validation survey against the design
Switching

The layer everything sits on

Access, distribution and core built to one standard across the estate, so a branch fault looks the same wherever it happens.

  • Campus and branch switching design and rollout
  • VLAN, routing and QoS standards applied consistently
  • Port security and network access control
  • Stack and uplink redundancy where uptime requires it
  • Configuration backup and version control
Operations

After the rollout

The rollout is a project. The network is a service, and it is the service that determines whether the project was worth it.

  • 24×7 monitoring with alerting into the NOC
  • Circuit fault management with the carrier on your behalf
  • Configuration change control and rollback
  • Capacity and utilisation reporting per site
  • Monthly service review with incident and SLA reporting
Authorisations

Carriers and network OEMs

Carriers & connectivity

Network & wireless

Next step

Tell us what you are running today

We will tell you what we would change, and what it would cost. No obligation, and a named engineer on the call rather than an account manager.